This month we did a lot of work on the bed despite the fridgid climate -- Cutting the wood, metal pieces, drilling the bolt holes (which we lucked out doing them perfect the first time with just eyeballing -- pictures of this to come). Finally we measured and installed the custom drive shaft and installed the electric fan.
Sunday, February 28, 2010
Subscribe to:
Posts (Atom)